1.) Totten Simms Hubicki :
      Recommended against the pipeline - in 1996


2.) Goulbourn Township Engineer,  Michael Pinet :
      Recommended against the pipeline - in 1997

  "There are several technical problems related to the transmission of sewage over long distances through forcemains, particularly due to the relatively small amount of sewage from Munster, and the length of time that the sewage spends in the forcemain. These technical problems and the associated costs have not been taken into account in any of these estimates."                                                                               - Michael Pinet. P. Eng.  

     The above quote by Michael Pinet, P.Eng., was one of the most forthright statements
       about the forcemain problems ahead, in the event of that selection.



3.) R.V. Anderson Associates, :
      Recommended against the pipeline - in 2003



NB: The contradictory work of the fourth engineering firm, (Conestoga-Rovers and Associates), was the subject of an OMB hearing, which found the results to be "imperfect". It is THAT "imperfect" study ---alone--- that the City has stubbornly adhered to, in the face of overwhelming contrary evidence.


CLOSE PAGE